|
Bridge closure Eisenspalterei
malfunctions

15.04.2026

Bridge closure Eisenspalterei

Closure due to maintenance work:
Due to maintenance work, the Finowkanal will be closed to all shipping in the area of the Eisenspalterei bridge (Fik – km 73.51).

Period: 19.05.2026, 8 am – 20.05.2026, 4 pm

Overview of the locks on the Finowkanal: Lock operation

Suche