Demolition work
construction log

05.06.2023

Demolition work

The appearance of the construction sites has changed considerably in recent weeks. Even though the sheet piling boxes have not yet been completed on all three locks, work has already begun on removing the top two meters of the lock chambers and heads as well as the lower main bridges in Ruhlsdorf and Leesenbrück. Only when the upper part has been removed can the installation of the excavation pit reinforcement begin so that the sheet pile walls do not tip into the excavation pit later due to the earth pressure.

Images: Comparison in Ruhlsdorf: left at the beginning of May 2023, right at the beginning of June 2023; the upper part of the chamber wall and heads has already been removed. In the background, the sheet piling work is still being completed.