Soil and structural investigations SP2
construction log

02.01.2024

Soil and structural investigations SP2

In lock package 2, which comprises the 6 eastern locks from Kupferhammer to Liepe, the necessary subsoil and structural investigations have been carried out in recent months. These investigations form the basis for the preliminary planning of the lock renovation. They provide information on the condition of the structures and the soil conditions in the lock area. For this purpose, horizontal and vertical boreholes are drilled in the lock chambers. In addition, the exact dimensions of the locks are recorded using 3D scanning.

In the pictures you can see the drilling rig and then a selection of the drill cores.