|
|
|
Restrictions in the construction site area

Restrictions in the construction site area

Restrictions for boats

  • Closure of the locks:
    Ruhlsdorf, Leesenbrück, Grafenbrück, Schöpfurth, Heegermühle and Wolfswinkel for boat traffic
  • It is not possible to transfer paddle boats at the above locks
  • The sections between the closed locks can be navigated
  • During the season, it is possible to enter the Finow Canal from the east as far as Drahthammer lock (family garden)
  • The Drahthammer and Kupferhammer locks are only operated on request; please register (at least 24 hours in advance) with the lock management by telephone on 0151 – 72438871

Restrictions for cars, pedestrians and cyclists

Ruhlsdorf lock

  • Detour of the cycle path onto the L31 depending on construction progress

Leesenbrück lock

  • Closure of the footpath across the lock and lock island
  • Restrictions on the “Treidelweg” footpath and cycle path south of the lock due to roadworks traffic, take care when passing!
Leesenbrück lock area
Leesenbrück lock area

Grafenbrück lock

  • Closure of the footpath across the lock and lock island
  • Restrictions on the “Treidelweg” footpath and cycle path south of the lock due to roadworks traffic, take care when passing!
Grafenbrück lock area
Grafenbrück lock bypass
Grafenbrück lock bypass

Heegermühle lock

  • Closure of the “Treidelweg” footpath and cycle path north of the lock during working hours, detour north of the KGA
  • Closure of the street “Am Finowkanal”, residents free
Lock area near Heegermühle lock
Lock area near Heegermühle lock
Detour towpath Heegermühle lock

Suche