Lock operation

In the 2025 season, our lock staff will operate the locks on the Finowkanal every day from 17th of April to 27th of October from 9:00 a.m. to 4:45 p.m.

Please note: Due to construction work, the western locks at Ruhlsdorf, Leesenbrück, Grafenbrück, Schöpfurt, Heegermühle and Wolfswinkel are out of service. It is possible to enter the Finow Canal via the Liepe lock (boat lift) and the canal can be navigated as far as the Drahthammer lock (Eberswalde-Familiengarten).

Maximum speed: 6 km/h
Requirements for navigation: no licence required
Maximum boat dimensions L x W in metres: 41.50 x 5.10 m
Draught season 2025: 1.20 m (Exception see below)

For current information on lock operation, disruptions or closures, please visit ELWIS.

 

Karte zu den Schleusenstandorten

Wir brauchen Ihre Zustimmung!

Diese Webseite verwendet OpenStreetMap um Kartenmaterial einzubinden. Bitte beachten Sie dass hierbei Ihre persönlichen Daten erfasst und gesammelt werden können. Um die OpenStreetMap Karte zu sehen, stimmen Sie bitte zu, dass diese vom OpenStreetMap-Server geladen wird. Weitere Informationen finden sie HIER